Current ICT Project

Investigators:
  Prof. Bassem Andrawes (Primary), Prof. Jerome Hajjar, Prof. Scott Olson
Project Title:
  DeKalb County Bridge Collapse Investigation (Special Project)
Start Date: 9/10/2008
End Date: 5/15/2009
Summary of Project:
  The Keslinger Road Bridge was a three-span simply supported bridge, consisted of precast prestressed deck supported on a group of timber pilings. The goal of this study is to investigate the reasons behind the abrupt failure of the bridge that occurred in the afternoon of August 19, 2008.
Objective of Project:
  Investigate the collapse of the Keslinger Rd. Bridge in Afton Township, DeKalb County, IL.
Expected Outcome:
  The final report of the project will include the following: 1) Detailed description of the experimental and analytical work conducted in the project. 2) Final conclusions in terms of the main cause(s) of failure.
Click here to check the status of this project.
Last Updated: 11/18/2009