Current ICT Project

Investigators:
  Imad Al-Qadi (Primary)
Project Title:
  Warm Mix Asphalt Study (Special Project)
Start Date: 7/16/2009
End Date: 3/15/2010
Summary of Project:
  This special project will include laboratory testing to evaluate the performance characteristics of new asphalt mixtures and will provide a method for comparison between the mixtures.
Objective of Project:
  The proposed study will provide laboratory testing to evaluate the performance characteristics of the asphalt mixtures that have been produced with these different technologies and materials.
Expected Outcome:
  The primary end result of this project is to evaluate the new asphalt mixtures and provide a method for comparison between the mixtures. IDOT will be able to compare the results of the laboratory performance testing and use this information when making decisions to implement these new mixtures on future projects.
Click here to check the status of this project.
Last Updated: 11/3/2009