08-04: STORM WATER POLLUTION AND EROSION AND SEDIMENT CONTROL PRODUCTS DEMONSTRATION AND TRAINING CENTER
The objective of this research project is to establish a training center site to demonstrate erosion control products with controlled rain (sprinklers). Such a site will save time from trying to locate appropriate construction sites and conditions to demonstrate erosion and sediment control products and will allow for the controlled instruction of the proper installation and use of erosion and sediment control devices.
Funds: $450,000 total, includes a required 25% ($112,500) cost share from proposing agency
Contract Time: 36 months
For more information, click on the link below to view the RFP.