Introduction and Overview
Outline: 0:00
Using Time Bookmarks 1:48
Certification Exam: 2:44
Class Materials as PDFs: 4:14
IDOT Standard Spec Book as PDF: 7:33
Synopsis: 9:54
DOC Guide: 11:08
Appendix: 24:23
Workbook: 26:11 -
Foundational Information
Outline: 0:00
Construction Inspector’s Checklists: 1:03
Construction Memorandums: 4:15
Coordination of Contract Documents: 13:53
Workbook Page 1 – Contract Documents Problem: 21:45
IDOT Standard Specs: 24:43
Sample Contract: 29:03
Pay Items: 30:23
Contract Award and Execution: 46:56 -
Standard Specs Division 100
Outline: 00:00
Section 104 – Scope of Work: 1:04
Section 105 – Control of Work: 1:57
Section 106 – Control of Materials: 3:06
Section 108 – Progress Schedule: 4:43
Section 108 – Contract Time Limits: 6:57
Section 109 – Measurement & Payment: 12:50
Pay Estimates – IDOT Web Page: 18:19 -
Section A - Project Diary & Quantity Book
-
Section A - Evidence of Material Inspection
Outline: 0:00
IDOT Project Procedures Guide (PPG): 1:52
Types of Evidence of Inspection: 3:47
Finding the Required Evidence: 5:44
IDOT Index of Lists – Qualified Producers: 10:18
Example of Evidence of Material Inspection: 14:37
PPG – Small Quantities Provision: 18:46 -
Section A - Source Documents
Outline: 00:00
Field Inspection Reports/Documents: 00:14
IDOT Inspector’s Daily Report (IDR): 1:22
Field Books: 3:28
Initials & Dates: 7:38
Section D – Reference Helpers: 8:05
Checking Work: 8:35
Plan Quantity Acceptance (BC 981): 11:12
Progress Documentation – Final or Estimated: 19:21
Use of Computers: 40:41
Field Measurements with Electronic Devices: 44:07 -
Section A - Extra Work & Material Allowance
Outline: 00:00
Agreed Unit Price: 1:28
Force Account Overview: 2:38
Prior Approval of Contract Changes (BC 2256): 4:04
Force Account Labor/Equipment/Materials: 5:07
Extra Work Daily Report (BC 635): 6:58
Sample Contractor’s Invoice: 8:26
Material Allowance: 14:46 -
Section A - Section A Max Pay and Yield Checks
Outline 0:00
Maximum Payment: 0:20
Workbook Page 2 – Maximum Payment Example: 2:09
Yield Checks: 5:13
HMA Theoretical Tons & Yield Checks – Workbook Pages 3 & 4: 6:13
Depth Checks: 13:49
Workbook Page 5 – Depth Check Problem: 15:49
Sidewalk Cross-slope Determination: 18:36 -
Section A - Paid by Weight Tickets
Outline: 00:00
Truck Tare Weights: 2:12
Weight Tickets: 4:13
Independent Weight Checks: 6:51
Small Quantities: 12:01
Final Documentation: 13:45
-
Section B – Acre/Hour/Calendar Day/Calendar Month
Outline: 00:00
Acre: 2:07
Hour: 4:21
Calendar Day: 5:33
Traffic Control Surveillance: 9:00
Workbook Page 6 – Traffic Control Surveillance Problem: 13:41
Calendar Month: 15:56 -
Section B – Cubic Yard
Outline: 00:00
Structure Excavation: 2:13
Workbook Page 7 – Structure Excavation Problem: 7:14
Trench Backfill: 8:52
Workbook Page 9 – Trench Backfill Example: 23:22
Workbook Page 12 – Trench Backfill Problem: 28:22
Concrete Structures: 33:43
Drilled Shafts: 38:17
Build According to Standard Number: 46:29 -
Section B - Each & Lump Sum
Outline: 00:00
Surface Variations (HMA): 00:52
Workbook Page 15 – Surface Variations Problem: 6:38
Traffic Control Price Adjustment: 9:59
Workbook Page 16 & 17 – Traffic Control Price Adjustment Problems: 20:03 -
Section B – Linear Foot
Outline: 00:00
Traffic Signal Cable: 1:00
Workbook Page 18 – Traffic Signal Cable Problem: 12:01
Pipe Culvert: 13:49
Driven Piles: 16:12 -
Section B – Pounds
Outline: 00:00
Prime & Tack Coat: 1:52
Workbook Page 19 – Prime/Tack Coat Problem: 27:40
Fabricated Structural Steel: 34:29
Fertilizer: 36:14 -
Section B – Square Feet & Square Yards
Outline: 00:00
Sidewalk: 00:51
Pavement Patching: 1:18
Workbook Page 20 – Patching Problem: 14:52
Base Course Widening: 20:48
Slope Wall: 21:58 -
Section B – Tons
Outline: 00:00
Aggregate Moisture Correction: 00:52
Agricultural Ground Limestone: 3:53
HMA Surface Course Adjust Plan Quantity: 9:45
Workbook Page 24 – HMA SC Adjustment & Maximum Payment: 18:33 -
Section B – Units & Unit Diameter
Outline: 00:00
Units: 3:52
Unit Diameter – Tree Removal: 8:46 -
Section B - Contract Changes / Traffic Inspection Reports / RRPLI
Outline: 00:00
Contract Changes: 00:19
BC 24 – Request for Procurement Policy Board Waiver: 2:57
BC 22 – Authorization of Contract Changes: 3:49
Traffic Control Inspection Reports: 6:12
Railroad Protective Liability Insurance (RRPLI): 9:13